• Built Environment Branch

    Built Environment Branch

    Deemed to Satisfy & Fire Safety Systems Consultation Meeting Request
    • This form should be completed and submitted to the DFES Built Environment Branch (BEB) with supporting information before a meeting can be booked with the BEB.
    • This form allows the applicant to book a time slot to discuss up to two projects only. Raising additional project/s during the meeting will not be permitted. Please lodge a new form/s  to discuss an additional projects.
    • Please note the advice provided is preliminary only.
    • Project teams wishing to submit their meeting minutes for record-keeping purposes only should email them within 10 working days following the meeting to BEBadmin@dfes.wa.gov.au
    • If there are comprehensive technical Direct Brigade Alarm (DBA) connection performance considerations, the DFES DBA Section Manager dba@dfes.wa.gov.au should be contacted to arrange a separate meeting with the applicant.
    • PLEASE NOTE * This “Deemed to Satisfy & Fire Safety Systems” consultation meeting will be attended by DFES Building Fire Safety Officers only. Any deviations from the NCC or performance-based fire engineered solutions will not be discussed during this time; otherwise, please submit a Fire Engineering & Deemed to Satisfy (DTS) Meeting Request.
  • DTS MEETING DETAILS

  • Address: Level 3, 1 Preston Street, Como WA

    Limit of 3 Attendees in the Meeting Room

  • APPLICANT DETAILS

    • DTS Project 1 Details 
    • DTS PROJECT 1 DETAILS

      1st Project Details
    • 0/100
    • 0/100
    • 0/200
    •  
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/200
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • DTS Project 2 Details 
    • DTS PROJECT 2 DETAILS

      Please provide the details of 2nd Project only
    • 0/100
    • 0/200
    • 0/200
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/200
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    •  
  • Please upload ALL relevant plans to this meeting request. Incomplete meeting requests will not be processed.

  • Please name the documents appropriately for easy identification
    For Example: Architectural plans Project 1, Hydrant coverage plans Project 2, etc.)

  • Please name the documents appropriately for easy identification
    For Example: Architectural plans Project 1, etc.)

  • Files Over 50 MB will not be processed.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Reload
  • Should be Empty: