• Built Environment Branch

    Built Environment Branch

    Fire Engineering Meeting Request
  • Purpose of the Meeting:

    • These meetings are preliminary in nature and are intended to occur prior to any formal lodgements.
    • The advice provided by DFES at this stage is for early guidance only.
    • More detailed advice will be provided following the submission of the Performance-Based Design Brief and Fire Engineering Report & DTS Plans.

    Scope of the Meeting:

    • This "Fire Engineering" consultation meeting will be attended by a DFES Fire Engineer / Technician and a Building Fire Safety Officer.
    • The meeting will cover both fire engineering and Deemed-to-Satisfy aspects of each project.
    • For projects without fire engineering or Performance Solution components, please submit a Deemed-to-Satisfy & Fire Safety Systems Consultation Meeting Request instead.

    Direct Brigade Alarm (DBA) Considerations:

    • For comprehensive technical DBA connection performance matters, please contact the DBA team at dba@dfes.wa.gov.au to arrange a separate meeting.

    Submission Requirements:

    • This form must be completed and submitted to the DFES Built Environment Branch (BEB), along with all relevant plans, before a meeting can be scheduled.
    • All submitted information and documentation must be accurate, complete, and up to date to ensure an effective and productive meeting.
    • All plans relevant to the discussion – including, where applicable, the flow and pressure test report – must be submitted as part of this request. Incomplete submissions may result in limited or inaccurate advice.

    Project Limit:

    • Applicants may book up to two projects within the same time slot. Details for both projects must be included in the same meeting request form. 
    • Adding a project at a later date is not permitted.
    • Only plans submitted with the meeting request will be discussed. Additional or unrelated plans must not be presented during the meeting.

    Meeting Minutes:

    • Automated summaries, such as those generated by Read.ai, are not accepted as official meeting minutes.
    • If the design team wishes to submit minutes, they must be prepared in a standard meeting minutes format and submitted within 10 working days to fireengineers@dfes.wa.gov.au and BEBadmin@dfes.wa.gov.au.
    • Please note that any minutes submitted may not be reviewed or endorsed by the DFES attending officers. However, all submitted minutes will be retained for record-keeping purposes.

    Confidentiality:

    • All submitted materials will be treated as confidential and used solely for the purpose of assessing the project(s).
  • MEETING DATE AND TIME

  • Meetings will be conducted via Microsoft Teams.

    For complex designs, meetings may be conducted in DFES BEB Office, Level 3, 1 Preston Street, Como WA. To enquire about the location of the meeting, please email fireengineers@dfes.wa.gov.au.

  • Address: Level 3, 1 Preston Street, Como WA

    Limit of 3 Attendees in the Meeting Room

  • APPLICANT DETAILS

    • Project 1 Details 
    • PROJECT 1 DETAILS

      Please provide the details of 1st Project only
    • 0/200
    •  
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/200
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • Project 2 Details 
    • PROJECT 2 DETAILS

      Please provide the details of 2nd Project only
    • 0/200
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    • 0/250
    • 0/200
    • 0/250
    • 0/250
    • 0/400
    • 0/250
    •  
  • Please upload ALL relevant plans to this meeting request. Incomplete meeting requests will not be processed.

  • Please name the documents appropriately for easy identification
    For Example: Architectural plans Project 1, Hydrant coverage plans Project 2, etc.)

  • Please name the documents appropriately for easy identification
    For Example: Architectural plans Project 1, etc.)

  • Files Over 50 MB will not be processed.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Reload
  • Should be Empty: