• Fire Hydrant Booster System

    Fire Hydrant Booster System

    Hydrostatic & Pre-Test Requirements
  •  

    This form must be completed and submitted to DFES at least four (4) weeks prior to the proposed test date.

     

    • A PDF copy of the proposed block plan must be included with this submission.
    • DFES will exercise reasonable care when discharging water during hydrant system testing. However, DFES accepts no responsibility or liability for any damage (actual or perceived) arising from the testing process. Responsibility for any such damage rests with the person in control of the site.

     

    ⚠️ Important Notice

    All Fire Hydrant Booster System Hydrostatic Test requests are subject to review and approval on a case-by-case basis. Submission of this form does not guarantee that testing will be approved or scheduled.

     

    Failure to comply with the instructions above may result in processing delays.

  • Hydrant / Booster Location Details

  • Applicant Details

  • Fire Hydrant System Installer

  • This Part to Be Completed by a Project Supervisor / Manager

  • Acknowledgement
    Please confirm that all of the following requirements have been completed prior to requesting a DFES Fire Hydrant Booster Test.

  • (Select all that apply)
  • Minimum required: 1700 kPa OR 1.5 × working pressure (whichever is greater)
    Test duration: minimum 2 hours.

  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Date:
     - -
  • Please note a request cannot guarantee a test. An officer will contact you once the form has been submitted.

  • Proposed Test Date:
  • DFES attendance at the site is to confirm the installed fire safety systems meets its Operational Requirements only and does not constitute acknowledgement of the system/s compliance with codes, standards or regulations.